Completed project

Africa Data Centers, Eko Atlantic: from prefabricated modules to an operational data center.

In 2021 Toptech played a key specialist installation role in the delivery of the Africa Data Centers facility at Eko Atlantic, Victoria Island, Lagos: a high availability Tier III facility built from prefabricated modular data halls. Engaged as specialist subcontractor to HITECH GREGFOR of South Africa, Toptech took the project from the physical installation of the modules through to electrical and cooling integration and commissioning, over approximately eight months.

Africa Data Centers, Eko Atlantic: from prefabricated modules to an operational data center.
Client
Africa Data Centers
Standard
Tier III facility, 1.1 MW initial build
Role
Specialist subcontractor: electrical, HVAC and data center installation
Scope
Rigging of 10 prefabricated modules, UPS and lithium batteries, MLV panels, 30 rooftop condensers, refrigerant piping, power cabling, commissioning
Implementation timeline
Phase 01
Rigging and positioning

Ten prefabricated containers received, rigged and positioned, five per floor.

Phase 02
Aggregation and reticulation

Modules aggregated and the internal reticulation and interconnections completed.

Phase 03
Electrical installation

Schneider UPS, lithium batteries, UPS output panels, MLV-A and MLV-B panels, cabling and containment.

Phase 04
Cooling installation

30 rooftop condensers with refrigerant piping and power to InRow units on two floors.

Phase 05
Integration and commissioning

Interfaces coordinated with HITECH GREGFOR; cooling and UPS commissioned and verified for handover.

Overview

The project formed part of the development of a high availability, Tier III data center facility incorporating modular data halls and supporting infrastructure. Public project information describes the initial development as a 1.1 MW facility forming part of a planned 5 MW development, with modular units positioned within the building and dedicated rooftop areas for power generation and cooling equipment.

Toptech was engaged as a specialist subcontractor to HITECH GREGFOR, South Africa, the contractor responsible for the modular data center solution, whose capabilities include turnkey data center infrastructure, modular containerised data centers, power management and precision cooling. Toptech's responsibility extended from the physical installation of the prefabricated modules through to electrical and cooling system integration and commissioning, with approximately 30 Toptech personnel involved across the stages of execution.

  • •Receipt and safe rigging of 10 prefabricated data center containers
  • •Positioning of five containers on the first floor and five on the second floor
  • •Aggregation of the containers and associated internal reticulation
  • •Installation and interconnection of critical electrical equipment within the modules
  • •Installation of Schneider UPS systems and lithium battery systems
  • •Installation of UPS output panels and associated power cabling
  • •Installation of MLV-A and MLV-B electrical panels serving the data center and associated loads
  • •Installation of cable trays, supports and fabricated steelwork
  • •Installation of 30 rooftop outdoor condenser units
  • •Refrigerant piping and power connections between the rooftop condensers and InRow cooling units on two floors
  • •Power cabling between the MLV panels, UPS systems and rooftop condenser units
  • •Cooling system commissioning, and testing and commissioning of the UPS systems
Data centre building
Data centre building
Five container data center layout across two floors
Five container data center layout across two floors
Section through the modular data halls
Section through the modular data halls
Rooftop plant: condensers and generators
Rooftop plant: condensers and generators

The problem

The project required the rapid and accurate integration of a highly engineered prefabricated data center solution within a constrained construction environment. Unlike a conventional building services installation, it involved factory configured modular units containing critical data center equipment that had to be transported to site, lifted into position, accurately aligned, aggregated and then connected into a functioning facility, with several specialist systems operating together across different levels of the building.

  • •Safe handling and positioning of large prefabricated modules: ten containers had to be received, rigged and positioned on their designated floors before the modules could be aggregated and interconnected
  • •Multidisciplinary system integration: electrical power, UPS systems, batteries, cooling, controls and other services had to be connected without compromising the integrity of the prefabricated modules or the overall data center configuration
  • •Cooling infrastructure across multiple floors: the rooftop condenser installation required coordinated routing of refrigerant pipework and electrical services to InRow cooling equipment serving data center spaces on two floors
  • •Complex power distribution: coordinated installation of the MLV-A and MLV-B panels, UPS input and output connections, condenser power supplies and associated cable containment
  • •Construction coordination: close coordination between Toptech's electrical, HVAC, installation and commissioning teams and the HITECH GREGFOR engineering team

The solution

Toptech adopted a coordinated, multidisciplinary installation approach combining rigging, electrical installation, HVAC installation, fabrication, containment, equipment integration and commissioning.

The ten prefabricated containers were received and rigged into their designated locations, five on the first floor and five on the second, then aggregated, with the internal reticulation and equipment interconnections completed. Within the modular environment Toptech installed and interconnected the Schneider UPS systems, lithium battery systems, UPS output panels and the MLV-A and MLV-B panels, which formed the power distribution points for the UPS systems and other connected loads, together with the power cables, containment and supplies to the associated data center and facility loads, and the power cabling from the rooftop plant area to the UPS input panels serving the two data center spaces.

A major part of the scope was the cooling infrastructure: 30 outdoor condenser units installed on the rooftop, with the refrigerant piping and electrical connections to the InRow cooling units in the data center spaces on two floors, and the fabricated steel supports, cable trays and service support infrastructure to carry it all. Working closely with HITECH GREGFOR engineers, Toptech coordinated the electrical and cooling interfaces so the modular equipment could operate as an integrated data center system rather than as isolated prefabricated units.

Following installation, Toptech carried out cooling system commissioning, UPS testing and commissioning, verification of equipment interconnections, and the inspections and completion activities required for handover. The result was an integrated installation connecting the prefabricated modules, electrical infrastructure and cooling systems into the wider facility.

Project impact

The project demonstrated Toptech's ability to execute complex, multidisciplinary data center installation works within a demanding project environment, combining heavy lifting and rigging, electrical power, UPS and battery systems, HVAC, refrigerant piping, cable containment, fabrication, equipment integration and commissioning.

It strengthened Toptech's experience in the delivery of modular and prefabricated data center infrastructure and demonstrated its capability to work effectively alongside international data center technology and engineering partners.

On site

8 photos

Outcomes & ROI

The project at a glance, as delivered by Toptech as specialist subcontractor over approximately eight months in 2021.

10
Prefabricated containers

Received, rigged and positioned, five on the first floor and five on the second

30
Rooftop condensers

Outdoor units installed and piped to InRow cooling on two floors

30
Toptech personnel

Approximately, across the stages of execution

8 mo
Toptech duration

Approximately eight months from module installation to commissioning

Ten disciplines, one integrated installation

Rigging, electrical power, UPS, batteries, HVAC, refrigerant piping, containment, fabrication, integration and commissioning delivered as one coordinated scope.

Modular data center capability

Prefabricated, factory configured modules turned into a functioning Tier III facility rather than isolated units.

Working alongside international partners

Delivered in close coordination with HITECH GREGFOR of South Africa, the modular data center solution provider.

Reporting method

Baselines are agreed before mobilisation and reported quarterly against uptime, efficiency and lifecycle cost.

Discuss your baseline