Our work

Designed and delivered projects across our capabilities.

Completed and ongoing engagements across data centers, banking, telecom and commercial campuses.

1 MW solar and 4.16 MWh battery storage for a leading religious organisation's new auditorium.
Featured project
Renewable energy · 2025

1 MW solar and 4.16 MWh battery storage for a leading religious organisation's new auditorium.

A 1.01 MWp rooftop solar array with 4.16 MWh of battery storage and 800 kW of Deye hybrid inverters, integrated with grid and generator supply and commissioned for one of Nigeria's largest worship facilities.

View case study

All projects

8 of 8 projects shown
A leading financial institution's headquarters: critical power and cooling maintenance.
Banking

A leading financial institution's headquarters: critical power and cooling maintenance.

Maintenance of the UPS, precision cooling, battery and switchgear plant behind a banking headquarters.

View case study →
Africa Data Centers, Eko Atlantic: from prefabricated modules to an operational data center.
Data centre · 2021 · Completed

Africa Data Centers, Eko Atlantic: from prefabricated modules to an operational data center.

Ten prefabricated data center modules rigged, aggregated and integrated with UPS, MLV distribution and 30 rooftop condensers, then commissioned, as specialist subcontractor to HITECH GREGFOR.

View case study →
21CTL Tier IV data center, Lagos, integrated end to end by one team.
Data centre · 2026 · Completed

21CTL Tier IV data center, Lagos, integrated end to end by one team.

Full physical infrastructure package integrated under a single contract and carried through to Tier certification.

View case study →
IHS Tier III data center fit out, Lagos.
Data centre · 2025 · Completed

IHS Tier III data center fit out, Lagos.

Critical power, DX cooling, panels, EMS, cabling, CCTV and access control under one integrator.

View case study →
UPS and standby power upgrade across 40 branches.
Banking · 2025 · Completed

UPS and standby power upgrade across 40 branches.

UPS replacement and remote monitoring rolled out across a nationwide branch network.

View case study →
Power resilience upgrade across 120 base transceiver stations.
Telecom · 2026 · Ongoing

Power resilience upgrade across 120 base transceiver stations.

Hybrid solar and diesel rollout with telemetry across a rural transceiver network.

View case study →
Chilled water cooling retrofit across a three building campus.
Commercial campus · 2024 · Completed

Chilled water cooling retrofit across a three building campus.

Phased chiller replacement and controls upgrade completed without disrupting occupied floors.

View case study →
Liquid cooling retrofit for a high density hall.
Colocation · 2026 · Ongoing

Liquid cooling retrofit for a high density hall.

Secondary fluid network and structural work for a hall converting to 130kW plus racks.

View case study →

Please contact Toptech Engineering for additional information on reference sites.