21CTL Tier IV data center, Lagos, integrated end to end by one team.

Toptech delivered the full physical infrastructure package: critical power, chilled water cooling, electrical panels, structured cabling, CCTV, access control and BMS, all integrated under a single contract and carried through to Uptime Institute Tier certification.

21CTL Tier IV data center, Lagos, integrated end to end by one team.
Client
21CTL
Standard
Uptime Institute Tier IV
Role
Single point systems integrator
Scope
Power, cooling, panels, cabling, CCTV, access control, BMS

Also delivered

IHS Tier III data center

Critical power, DX cooling, electrical panels, EMS, structured cabling, CCTV and access control, delivered under the same single integrator model.

Implementation timeline
Phase 01
Consultancy and design

Tier IV compliant design across power, cooling and building services, certification criteria fixed at the outset.

Phase 02
Panel build and procurement

Panels constructed in house; long lead cooling and distribution equipment procured through OEM partner channels.

Phase 03
Construction and installation

Parallel work fronts under one site management structure.

Phase 04
Integration and testing

All eight systems brought under the BMS, then tested together at load to prove fault tolerance.

Phase 05
Certification and maintenance

Tier certification achieved, followed by transfer onto a 24 x 7 x 365 managed maintenance contract.

Outcomes & ROI

Reported against the baseline agreed before mobilisation, covering uptime, efficiency and lifecycle cost.

IV
Tier certified

Uptime Institute Tier certification achieved for the facility

1.29
Rolling PUE

Power usage effectiveness against a 1.35 design target

4+ wks
Fault warning

Median warning ahead of incipient faults identified by the models

365
Days of cover

Maintenance cover retained after handover

Tier IV certification achieved

Fault tolerance was proven across every concurrent system, not just the electrical package.

Eight systems, one accountable party

A single integrator removed the interface risk that ordinarily arises between trades.

Supported beyond handover

The engineers who built the facility maintain it, with monitoring in place from handover.

Reporting method

Baselines are agreed before mobilisation and reported quarterly against uptime, efficiency and lifecycle cost.

Discuss your baseline

Partners we work with

Schneider Electric Vertiv Eaton ABB Siemens Microsoft Dell HP CommScope NTI Uptime Institute Huawei Avnet AKCP Paessler Indelec Canovate Veritas ACTi Cisco Elitech Panduit VMware IBM KEMP Technologies SolarWinds Bosch Kehua Tech Siemon Amaron Quanta FingerTec Gallagher Solis Hiref Socomec